1. Take four useful photographs
- A wide view showing the stump and nearby surroundings.
- A closer view showing the cut surface and visible root flare.
- The full route from a driveway or legal parking area.
- The narrowest gate, turn, step, slope, or overhead obstruction.
Keep people, pets, vehicles, and identifying documents out of the frame when they are not needed to explain access.
2. Record the basic measurements
- Number of stumps.
- Approximate widest visible diameter at ground level.
- Approximate stump height above the surrounding ground.
- Narrowest clear gate or passage width.
- Steps, slopes, soft ground, tight turns, and surface roots.
These are quote-preparation details only. The provider must confirm the measurements, equipment access, hazards, and work plan on site.
3. Establish the utility-locating plan
Michigan's Public Act 174 requires advance notice before covered excavation. Before powered ground work begins, confirm who will place the MISS DIG 811 notice, whether the required responses are complete, and how the marks will be protected. The state's guidance says the free service covers public facilities; privately owned lines require separate locating.
4. Flag right-of-way questions early
If the stump, access route, or equipment may enter a county road right-of-way, ask the provider and the appropriate road authority what authorization is required. The Macomb County Department of Roads says homeowner or contractor work within its right-of-way requires a permit; the agency decides whether that rule applies to a particular location and scope.
Macomb County Department of Roads permit FAQ
5. Decide what “finished” means
Tell the provider whether chips may remain or whether the area should be prepared for grass, replanting, hardscape, or construction. Confirm depth, surface-root work, chip removal, fill, grading, and seeding as separate written items.
6. Compare the written scope
- The number and identity of the stumps included.
- The intended grinding depth and any surface-root work.
- Whether chips remain, are hauled away, or are redistributed.
- Whether backfill, topsoil, grading, seed, or restoration is included.
- Who handles utility notices, private lines, and required permits.
- Price, payment timing, exclusions, and responsibility for damage.
Review the separate Macomb County cost-factor guide and grinding-versus-removal comparison before accepting a scope.